Crash test A1 – the process

A.1 Crash test (Change of situation). The work is pursuit of a turning point or changes the situation. Are performed circular movements. The movement is slow, builds up an intention (to detect presence) and then triggers a response to the user. The answer is throwing land.

raw test

  • Basic elements

 

  • Modules

 

 

The site

  • Preparation

scheme – A.

scheme – B. Land only

scheme – C. Ramp, alternate floor

 

  • Construction plan

One the options. Representation units: inches

Representation units: inches

 

  • Modules at work

Module. Representation units: inches

 

  • Sensor adjustment during the day and night.


  • Other projection

units: inches

  • Workflow

 

 

 

 

 

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>