Construction process

   

  

Parts scheme

                                            part                               description

                                            01                                  movement

                                            02                                   open

                                            03                                   time

                                            04                                   transducer

                                            05                                   Control knob

Land movement

The final piece is summarized as: open land through a linear movement over a length of six meters. Controlled by a commandthat manipulates the user or viewer.

 

schematic, top view

schematic, view cut

Unit of measure: Centimeters